Mental Health ward, Springfield Hospital

IMAG0135

The project was to change a large office building into a new state of the art mental health secured ward. We installed the electrical, plumbing and HVAC systems for this scheme. All materials used had to be anti-ligature specified including light fittings, heater panels, sanitary ware and even screws. The toilets, sinks and showers were all operated by infra-red and piezo controls. … [Read more...]

Thomas Bennett School

DSC01815

This was a new 2 storey classroom and drama studio building which we undertook on as a design and build project. A full AutoCAD and internal and external relux schemes were produced to comply with BREEAM specification. The scheme included a daylight linking lighting system and drama studio and stage lighting systems. … [Read more...]

Stanwell Health Centre

IMAG0059

This project was a new build 3 storey modern health centre including a café, library and pharmacy. We undertook the electrical and mechanical package including the lighting control system, building management system, HVAC, security, fire alarm and car park lighting scheme. We undertook the full design package on the project including the restrictions of BREEAM. The project received BREEAM … [Read more...]

Castle Hill Primary School

castlehill Primary

We undertook two phases of this project. The first was a new reception classroom block including the offices and W.C. areas. All lighting was controlled by a light sensitive dimming system. The second phase was the new dining hall. The wall lighting scheme produced an attractive effect for the arched building design. … [Read more...]